Stability Pull Schedule Planner

ICH-style pull dates from study start — long-term, accelerated, or intermediate.

Build an ICH-style stability pull calendar from your study start date — long-term, accelerated, or intermediate protocols for QC planning and protocol alignment.

Results

Pull points

8

Protocol

ICH long-term

Final pull

Jul 18, 2029

Start (T0)

Jul 18, 2026

Time pointPull date
T0 (initial)Jul 18, 2026
3-monthOct 18, 2026
6-monthJan 18, 2027
9-monthApr 18, 2027
12-monthJul 18, 2027
18-monthJan 18, 2028
24-monthJul 18, 2028
36-monthJul 18, 2029

ICH long-term (typical): 8 pull points from Jul 18, 2026 through Jul 18, 2029. Align with your approved stability protocol, storage conditions, and ICH Q1A — this is a planning calendar only.

infoCompendial planning aid. Compendial planning aid only — not a substitute for your validated SOP, pharmacopeial edition in force, regulatory submission, or qualified-person release decision. Always verify sampling tables against the official USP-NF (or applicable pharmacopeia) and your quality system before testing or batch disposition.

Need expert help?

Build stability protocols in Pharma Quality Studio

Pharma Quality Studio helps you align pull schedules with approved protocols, storage conditions, and stability report sections.

psychologySpecialist: Melody — Pharma & GMP

Sign in to chat with Melody and build audit-ready plans in the studio.

Stability calendars drive QC workload months ahead

Every drug product stability program has pull points — T0, 3-month, 6-month, and beyond depending on zone and protocol. Missing a pull date creates deviations; over-pulling wastes scarce material.

ICH Q1A defines typical long-term, accelerated, and intermediate schedules, but your approved protocol and label claims are authoritative.

This planner gives a fast calendar from your start date. Pharma Quality Studio is where stability protocols, trending, and annual report narratives live.