boltInstant · No signup · No AI credits

OOIP & OGIP Volumetric Calculator

Original oil or gas in place from area, thickness, porosity, water saturation and Bo or Bg.

640 acres = 1 square mile

Typical 1.1–1.6. Get it from the PVT calculator.

Results

OOIP in place

22.52 MMSTB

Recoverable

5.63 MMSTB

Bulk volume

28,800 acre-ft

Hydrocarbon pore volume

28,152,230 rb

OOIP ≈ 22.52 MMSTB from 640 acres × 45 ft at 18% porosity and 30% Sw. At 25% recovery: ≈ 5.63 MMSTB recoverable.

Next step

Build P10 / P50 / P90 reserves cases

Your result goes with you, so there's nothing to retype.

engineeringEngineering screening only. Engineering screening calculator only — not a substitute for licensed professional engineering, API/ASME/code-compliant design, certified reserves audits, regulatory well approvals, or field-measured PVT and flow data. Verify all inputs, units, and correlations against your facility standards and qualified sign-off before operations or design decisions.

What this means

Reading your volumetric estimate

layers

Net pay, not gross

Use net pay thickness after porosity and shale cut-offs. Gross thickness can overstate oil in place by 30% or more in laminated sands.

stacked_line_chart

One number is not a reserve

Area, porosity and Sw all carry uncertainty. Run low, mid and high cases and report a range, then check it against material balance once pressure data exists.

Need expert help?

Build P10 / P50 / P90 reserves cases

Spreadsheet Studio with Caleb turns one volumetric estimate into a probabilistic reserves table with sensitivities.

psychologySpecialist: Caleb — Petroleum Engineer

Sign in to chat with Caleb and turn this into a full plan in the studio.

Volumetrics: the first number every new field gets

Before there's any production history, oil in place comes from rock volume and fluid properties: N = 7,758 · A · h · φ · (1 − Sw) / Bo. For gas, G = 43,560 · A · h · φ · (1 − Sw) / Bg.

The inputs are uncertain, so one deterministic number is only a starting point. Run low, mid and high cases for area, net pay and porosity, and compare with material balance once you have pressure data.

Recovery factor turns in-place volume into reserves. Primary oil recovery is often 5–30%; gas reservoirs under depletion can recover 70–90%.